Phase inspection program · Eden Prairie

New construction inspection — independent eyes before the rock goes up.

Pre-pour, pre-drywall, and final-walk inspections on premium custom builds. Bearpath additions, Hennepin Village infill, Lake Riley customs. We document what the framing, electrical, plumbing, and HVAC look like before insulation and drywall hide them forever.

Pre-drywall · code-citation findings Independent of builder Same-evening report
Why this matters in Eden Prairie

Premium custom builds still produce defects.

New construction in Bearpath additions, Hennepin Village infill, and Lake Riley customs is built to a high standard — and no builder is exempt from missed details. Eden Prairie's premium custom tier routinely produces 30–80 documented pre-drywall items: misaligned beam pockets, missing fire-blocking, undersized return-air, plumbing-vent terminations buried in framing, bath fans terminating into attic insulation. The municipal inspector signs the permit; we represent the buyer. Those are different jobs.

3 phases
Pre-pour · pre-drywall · final
30–80
Typical pre-drywall items
11 mo
Warranty inspection follow-up
24 hr
Report by 9 PM each phase
Pre-drywall defect taxonomy

Six categories that disappear behind the rock.

These six finding categories drive the bulk of pre-drywall write-ups on Eden Prairie premium custom builds. Once insulation and drywall close in, every one of them becomes a destructive-investigation problem.

Critical

Fire-blocking gaps

Missed fire-blocks at floor penetrations, soffit drops, chase walls. Code-required, easy to miss in custom layouts. Universal pre-drywall flag on multi-story Eden Prairie customs.

Critical

Header / framing schedule

Header configuration not matching plan, missing jack studs, nail patterns off-schedule, beam pockets misaligned. Verified against approved structural plan, not just builder's framing crew.

Major

HVAC trunk & return

Undersized return-air paths, trunk runs without proper support, missing dampers on zoned systems, supply registers blocked by joist webbing. Hard to fix after rock.

Major

Plumbing rough-in

Vent terminations buried in framing, kinked PEX runs, supply lines unsupported across joist bays, shower-pan flashing geometry, drain slope. Pre-rock visibility is the only meaningful inspection.

Major

Electrical home runs

Cables sharing staples in violation of code, home runs not derated for bundling, missing nail-plates at studs <1¼" from face, low-voltage and line-voltage inappropriately combined.

Monitor

Vent terminations & bath fans

Bath fans terminating into attic insulation rather than through-roof, dryer ducts longer than code allowance, plumbing vents not extended above roof line. Documented before insulation closes the path.

Phase inspection program

When we visit, what we look at.

The standard premium-build program for Eden Prairie. Three core phases, two optional. Quote any combination.

PhaseTimingFocusWhy it matters
Pre-pour foundationBefore slab/stem-wall pourRebar placement, drain tile, dampproofing, insulation, footingLake-belt lots
Roof dry-inUnderlayment installed, before shinglesFlashing geometry, ice/water shield coverage, valley linersComplex roofs
Pre-drywallRough-ins complete, before insulationFraming, electrical, plumbing, HVAC — full visibilityHighest value
Final walkBefore closingTrim, fixtures, HVAC commissioning, finished-grade, exterior caulkClosing leverage
11-month warranty11 months after closingSettling, HVAC commissioning issues, finish-grade movementPre-warranty expiry
How a phase visit runs

Three steps. Builder coordinated, buyer represented.

01 / SCHEDULE

Coordinate with the superintendent

We contact the site super directly to confirm rough-in completion and schedule the visit before insulation arrives. Plan-set review against approved structural and mechanical drawings happens before site arrival.

~3–5 days before
02 / WALK

Pre-drywall inspection

Two to four hours on site depending on home size. Framing, electrical, plumbing, HVAC, structural. Photographs every wall cavity, every penetration, every junction. Code citations on every flagged item.

2–4 hrs on site
03 / DELIVER

Same-evening report to builder

Full report by 9 PM. Code-cited findings the superintendent can hand directly to the trades. Reputable Eden Prairie builders correct without dispute. Follow-up site visit available to verify corrections.

By 9 PM

Pre-drywall is the single most valuable inspection moment of a build.

Two-minute quote. Coordinated with your superintendent. Same-evening report.

Get my free quote →
Frequently asked

New construction inspection, answered.

Will my builder allow a third-party inspection?
Reputable Eden Prairie builders welcome third-party inspections — and the ones who push back are exactly the ones who most need oversight. We coordinate directly with the site superintendent on timing and access. Bearpath and Hennepin Village builders are accustomed to phase inspections.
What is a pre-drywall walk and why does it matter?
After framing, electrical rough-in, plumbing rough-in, and HVAC rough-in are complete but before insulation and drywall close everything in. It is the single most valuable inspection moment in a new build because every system is visible. Once the rock goes up, you cannot see a missed fire-block, a kinked PEX run, or an unsecured strap until it fails.
How many inspections should I have on a new build?
Three is the standard premium-build program: pre-pour foundation review, pre-drywall walk after rough-ins, and final walk before closing. We add a roof inspection at dry-in for complex geometries and an 11-month warranty inspection eleven months after closing — five visits total over a 24-month arc.
What do you find at the pre-drywall stage?
Missed fire-blocking, draft-stopping gaps, plumbing-vent terminations buried in framing, HVAC trunk runs without proper support, electrical home runs sharing staples with NM cable, framing nail patterns missing schedule, header configurations not matching plan, and shower-pan flashing details. Premium custom builds in Eden Prairie commonly produce 30–80 documented items at pre-drywall.
Will calling out defects damage my relationship with the builder?
Reputable builders treat phase-inspection findings as quality control, not adversarial. We write findings in plain, professional language with photographs and code citations. The vast majority are corrected without dispute. The exceptions tell you something important about the builder before final closing — which is exactly what you hired us for.
What does the final walk catch that the builder's punch list misses?
HVAC zone commissioning that does not match the design intent, missing AFCI breakers, landscape grade pulled away from the foundation post-final-grade, fixture trim damage hidden by shipping wrap, attic baffle compression at the eaves, and exterior caulk gaps at trim transitions. The builder's superintendent has a punch list; ours has a separate list focused on what they routinely overlook.
Are pre-pour and roof dry-in inspections necessary?
Pre-pour is high-value on lake-belt lots near Mitchell Lake and Round Lake — we verify rebar placement, foundation drain tile, exterior dampproofing, and insulation. Roof dry-in is high-value on Bearpath and Hennepin Village multi-pitch geometries where flashing and underlayment are about to disappear under shingles.
What about the 11-month warranty inspection?
Schedule it eleven months after closing — most builders honor the warranty before the 12-month expiry. By eleven months, settling cracks have appeared, HVAC commissioning issues have surfaced through both heating and cooling seasons, and finish-grade settlement is visible. We have a separate page covering this inspection.