New construction inspection — independent eyes before the rock goes up.
Pre-pour, pre-drywall, and final-walk inspections on premium custom builds. Bearpath additions, Hennepin Village infill, Lake Riley customs. We document what the framing, electrical, plumbing, and HVAC look like before insulation and drywall hide them forever.
Premium custom builds still produce defects.
New construction in Bearpath additions, Hennepin Village infill, and Lake Riley customs is built to a high standard — and no builder is exempt from missed details. Eden Prairie's premium custom tier routinely produces 30–80 documented pre-drywall items: misaligned beam pockets, missing fire-blocking, undersized return-air, plumbing-vent terminations buried in framing, bath fans terminating into attic insulation. The municipal inspector signs the permit; we represent the buyer. Those are different jobs.
Six categories that disappear behind the rock.
These six finding categories drive the bulk of pre-drywall write-ups on Eden Prairie premium custom builds. Once insulation and drywall close in, every one of them becomes a destructive-investigation problem.
Fire-blocking gaps
Missed fire-blocks at floor penetrations, soffit drops, chase walls. Code-required, easy to miss in custom layouts. Universal pre-drywall flag on multi-story Eden Prairie customs.
Header / framing schedule
Header configuration not matching plan, missing jack studs, nail patterns off-schedule, beam pockets misaligned. Verified against approved structural plan, not just builder's framing crew.
HVAC trunk & return
Undersized return-air paths, trunk runs without proper support, missing dampers on zoned systems, supply registers blocked by joist webbing. Hard to fix after rock.
Plumbing rough-in
Vent terminations buried in framing, kinked PEX runs, supply lines unsupported across joist bays, shower-pan flashing geometry, drain slope. Pre-rock visibility is the only meaningful inspection.
Electrical home runs
Cables sharing staples in violation of code, home runs not derated for bundling, missing nail-plates at studs <1¼" from face, low-voltage and line-voltage inappropriately combined.
Vent terminations & bath fans
Bath fans terminating into attic insulation rather than through-roof, dryer ducts longer than code allowance, plumbing vents not extended above roof line. Documented before insulation closes the path.
When we visit, what we look at.
The standard premium-build program for Eden Prairie. Three core phases, two optional. Quote any combination.
| Phase | Timing | Focus | Why it matters |
|---|---|---|---|
| Pre-pour foundation | Before slab/stem-wall pour | Rebar placement, drain tile, dampproofing, insulation, footing | Lake-belt lots |
| Roof dry-in | Underlayment installed, before shingles | Flashing geometry, ice/water shield coverage, valley liners | Complex roofs |
| Pre-drywall | Rough-ins complete, before insulation | Framing, electrical, plumbing, HVAC — full visibility | Highest value |
| Final walk | Before closing | Trim, fixtures, HVAC commissioning, finished-grade, exterior caulk | Closing leverage |
| 11-month warranty | 11 months after closing | Settling, HVAC commissioning issues, finish-grade movement | Pre-warranty expiry |
Three steps. Builder coordinated, buyer represented.
Coordinate with the superintendent
We contact the site super directly to confirm rough-in completion and schedule the visit before insulation arrives. Plan-set review against approved structural and mechanical drawings happens before site arrival.
Pre-drywall inspection
Two to four hours on site depending on home size. Framing, electrical, plumbing, HVAC, structural. Photographs every wall cavity, every penetration, every junction. Code citations on every flagged item.
Same-evening report to builder
Full report by 9 PM. Code-cited findings the superintendent can hand directly to the trades. Reputable Eden Prairie builders correct without dispute. Follow-up site visit available to verify corrections.
Pre-drywall is the single most valuable inspection moment of a build.
Two-minute quote. Coordinated with your superintendent. Same-evening report.