ASTM E2018 · Eden Prairie tech corridor

Commercial property inspection — lender-grade PCAs for the corridor.

ASTM E2018 Property Condition Assessments along the UnitedHealth/Optum tech corridor — Highway 5, Highway 169, Technology Drive, Viking Drive. Roof, RTU, fire suppression, ASHRAE 62.1, ADA, and a 10–12 year capital reserve schedule your lender expects.

ASTM E2018 framework Drone + walked roof
Why this matters in Eden Prairie

Tenant load has outgrown the original design.

Eden Prairie's tech-corridor stock is heavily 1985–2010 in original construction, with layered tenant improvements over original infrastructure. The building you are inspecting is rarely the building that was permitted. UnitedHealth, Optum, and tech tenants run 8–15 W/sq ft where the design assumed 1.5 W/sq ft. RTU stock is aging, R-22 is on the way out, and ASHRAE 62.1 ventilation is the most common deficiency on densified suites.

8 systems
ASTM E2018 PCA categories
10–12 yr
Capital reserve forecast horizon
15–25 yr
Asphalt service life · MN freeze-thaw
1985–2010
Dominant corridor build era
Finding taxonomy

Six conditions that drive the capital schedule.

A PCA is not a punch list. Findings get translated into a 10–12 year capital expenditure forecast. These are the six categories that consistently dominate that schedule on Eden Prairie corridor buildings.

Critical

Low-slope roof & ponding

TPO, EPDM, modified bitumen, BUR. Surface ponding chronically affects 15–25% of roof area on corridor buildings. Penetration flashings are the highest-frequency leak source.

Critical

Aging RTUs · R-22

RTU stock 18–25+ years, R-22 refrigerant systems still common. Phaseout cost exposure. Capacity often undersized for current tech-tenant load.

Major

Ventilation underdelivery

ASHRAE 62.1 outdoor-air delivery measured against current occupancy. Densified tenant build-outs almost always fall short of the original design.

Major

Fire suppression patchwork

Tenant-installed clean-agent systems, re-programmed alarm panels, mismatched detection layered over the base wet-pipe system. Documents and reconciles.

Major

Asphalt & ADA

PCI-style pavement scoring, striping, accessible-parking compliance. Title III review covers accessible route, doors, restrooms, signage. Feeds the capital schedule.

Monitor

Envelope & failed IGUs

Failed insulated glazing units, thermal bridging via thermal imaging, air-sealing failures, panel-system seam leaks. Energy and tenant-comfort cost driver.

Eden Prairie commercial sub-market

Where the corridor work happens.

Sub-market profile across Eden Prairie's commercial belt and adjacent corridors we serve.

Sub-marketTypical assetCommon findingsEngagement type
UnitedHealth / Optum corridorBig-floorplate single-story officeDensified tenant load, ASHRAE 62.1 underdelivery, RTU agePCA
Highway 5 / Technology Dr.Multi-tenant office, flexRoof penetration leaks, R-22 systems, parking agingPCA
Highway 169 / Viking Dr.Office and corporate campusCapital deferred backlog, BAS orphans, ADAPCA
Eden Prairie Center areaRetail, mixed-useEnvelope sealing, HVAC zoning, parking-lot stripingPCA · roof
Chanhassen / ChaskaFlex industrial, light manufacturingRoof, dock-leveler condition, fire suppressionPCA
Pre-1985 buildingsOlder office, retail conversionsAsbestos survey trigger, original mechanicalsPCA + ESA
How a PCA runs

Three phases. Coordinated with counsel and lender.

01 / SCOPE

Pre-LOI scoping & doc collection

Scope letter, documents (rent roll, capex history, prior reports, permit history, leases, mechanical drawings), site coordination with property manager. Phase I ESA coordinated where applicable.

2–5 business days
02 / WALK

On-site PCA

Roof access via drone plus walked, mechanical penthouses with infrared, representative occupied tenant suites plus full vacant walk, site/parking/exterior, exit interview with property manager and broker.

1–2 days on site
03 / DELIVER

Report + capital schedule

Executive summary, system narrative, deficiency log with cost-to-cure, 10–12 year capital reserve schedule. Formats suitable for buyer's counsel, lender, and equity. Mid-engagement major-finding flag standard.

7–10 business days

Under LOI? Get a PCA scope letter today.

ASTM E2018 framework. Lender-grade. Expedited delivery available.

Request a scope →
Frequently asked

Commercial PCAs, answered.

Do you perform ASTM E2018 Property Condition Assessments?
Yes — PCA delivery is the core of our commercial practice. We deliver lender-grade PCAs for office buildings, flex industrial, multi-tenant tech-corridor properties, and multi-family acquisitions across Eden Prairie and the Highway 5 / 169 corridor.
What does the PCA report include?
Executive summary, system-by-system narrative across the eight ASTM E2018 categories, photographic documentation, identified deficiencies with cost-to-cure estimates, and a 10–12 year capital expenditure forecast suitable for buyer underwriting and lender review.
How long does a commercial inspection take?
For a typical 80,000 sq ft single-story office building, 1–2 days on site followed by 7–10 business days for report production. Expedited 5-day delivery is available. Larger or multi-building portfolios scale linearly.
Do you inspect the roof on commercial buildings?
Yes. Drone deployment plus walked inspection where access permits. We document low-slope membrane condition (TPO, EPDM, modified bitumen), seam integrity, ponding zones, parapet flashing, drains, and penetration flashings — the highest-frequency leak source on corridor buildings.
How do you handle aging RTU and R-22 systems?
We document RTU age via data-plate decode, refrigerant type, capacity vs. modern tech-tenant load (8–15 W/sq ft typical vs. 1.5 W/sq ft original design), and remaining useful life. R-22 systems are flagged for replacement planning given phaseout cost exposure.
Do you assess ASHRAE 62.1 ventilation compliance?
Yes. Outdoor-air delivery is verified against ASHRAE 62.1 occupancy-based requirements. Underdelivery is the most common finding on tech-tenant build-outs that have densified beyond the original design.
What about ADA and parking-lot condition?
ADA Title III review covers accessible route, doors, restrooms, and signage. Parking is documented with PCI-style condition scoring across freeze-thaw asphalt, striping, and accessible-parking compliance. Both feed the capital schedule.
Do you coordinate Phase I ESAs?
Yes — we coordinate ASTM E1527 Phase I ESAs and other specialty work (asbestos surveys on pre-1985 buildings, roof subsystem specialists, mechanical specialists) so buyer's counsel and lender receive a coherent due-diligence package.

Schedule Your FREE Inspection Quote in Eden Prairie, MN

Premium properties deserve a precision inspection. Two-minute quote. Booking This Week. Same-evening report.

InterNACHI Master Certified Inspector · Reports in 24 Hours